Description of Project: Red Lake Wastewater Treatment Plant project consisted of preliminary design, final design and initial funding application for the Red Lake Wastewater Treatment Plant, 3 miles of force main and lift station.

Responsibilities included:

  • Collection, interpretation and report on project feasibility.
  • Recommendations of concerned regulatory agencies.
  • Social-economic and environmental research, & planning.
  • Public information meeting
  • Preparation of design plans, specifications, and bidding documents.
  • Estimate of construction costs (Engineers Estimate).
  • Preparation of permit applications..
  • Laboratory and materials testing.
  • Land surveys, establishments of boundaries and monuments.
  • Field surveys, photogrammetry, and topographic.
  • Preparation of applications for government grants.
  • Easements; Right-of-Way and monumentation of plats.
  • Construction inspection, staking, and contract administration

 